Anyway, shes out and well the house is gross. Feedback from potential buyers was that it was in such poor condition they were overwhelmed with the amount of work that needed to be done
Lenny got me some contact numbers for 2 contractors today, 1 for flooring and 1 for paint. Gonna give them a call and get some estimates on having that done. In addition I got quiet a fix it list
- Paint house -- done
- Replace carpet -- done
- Cable outlet cover master -- done
- Microwave --done
- Blinds back patio and wood cover -- done
- Kitchen sink and faucet -- done
- Kitchen lights fixture -- done
- Front blinds -- done
- Bathroom light -- done
- Bathroom wallpaper -- done
- Garage way light fixture
- Doors painted -- done
- Plants backyard
- Mow backyard
- 4x8 drywall kitchen light -- done
- Flush microwave 12... Existing 16.5 -- done
- Master bedroom blinds 71x34.5 -- done
- Master bath cabinets 1 cabinet
- Master bath vanity cabinet 31.5x22 -- done
- Guest bathroom cabinet 3 piece, 1 each side double for sink -- done
- Guest bathroom sink -- done
- Guest bathroom lights -- done
- Ceiling fan -- done
- 4 recessed lighting floods -- done
- 2 box lights -- done
Looks like im gonna be spending my evenings and weekends out there getting stuff taken care of so we can sell it.

